How to operate a data centre on a $5k budget for 4 years

Data Centre Afrika

Server Dome data centre have done just that with their geodesic dome-shaped data centre, that provides small footprint and is virtually maintenance free.

The dome data centre design, according to Server Dome, helps to reduce the required mechanical systems in the facility to just one—the Air Handling Units.

By using natural convection, it eliminates cooling equipment like air conditioning units, exhaust fans, dehumidifiers, chillers and CRACs, helping make considerable savings on electricity costs.

Brian Duke, VP Sales & Outreach at Server Dome told Data Economy: “The design of the dome is extremely efficient and only requires replacement of the filters and periodic inspection of the aluminum exterior structure”.

The current design uses 52U racks, but the design specifications can include 3,000 pound racks and up to 40KW per rack.

Server Dome projects a growing capacity plan for 15 years and a sustained capacity at that level into the future.

They also predict that the physical structure should have a lifespan of 30+ years, as power and cooling can be upgraded and/or replaced at any time without impacting the design or operations, according to Server Dome.

The data centre also uses less than 1,533 gallons of water a year, adding to a minimised maintenance cost, with a positive effect of having zero down time in nearly four years of operation.

The only technical barriers encountered with systems design, architecture, and deployment were regarding the owner/user “fear” associated with a radical new concept for data center design, according to Server Dome.

The strength of the design includes significant computational fluid dynamic modeling of the model and generation of supporting data to prove that the operational outcomes are valid.

The data centre is also vendor neutral, with nothing in the design or operation of the data centre that requires specific hardware, network or storage.

The company say they have a power usage effectiveness (PUE) rating as low as 1.06, that’s “34% better than any conventional centre”.

Source: https://data-economy.com/how-to-operate-a-data-centre-on-a-5k-budget-for-4-years/

View all Press Releases
Loading
Join us at Data Centre Africa which opens in...

Join us at Data Centre Africa which opens in...

Exhibitors

234

CDCP TRAINING

Join the world of elite certified data centre professionals!

DCA partners with EPI, the world leader in data centre education

DCA is bringing for the second time to Zimbabwe, the global leading CDCP training and certification for data centre professionals

DCA has partnered with EPI to enable an EXCLUSIVE offer available only with DCA. 

Sponsors

Testimonials

  • We were looking for a place that is a premium vehicle for our products, a wide demographic to grow our business and 2 day’s worth of sales leads to grow over the next 12- 18 month and that is exactly why we are at Data Centre Africa 2019. We have had great conversations and looking forward to creating business with the leads generated from the 2 days.
    David Howe
    CEO, Dermat Limited
  • Data Centre Africa Conference is the go to event for exhibitors in the data centre sector. We want to see the event grow and develop into a leader of all data centre industry events and that’s why we exhibit here. The event will definitely not disappoint, we are looking forward to see many clients & customers multiple new faces – this will lead to lots of visitors coming to ask questions, new networking opportunities and leads.
    Jack Peckham
    Business Development Manager, Rene Electronics

Sign up for the newsletter